How long is the container construction period?

How long is the container construction period?

How long is the container construction period?

According to the project budget, design, site construction environment, construction period requirements, etc., it will generally be about 2-6 weeks.

How to do waterproof treatment?

1. For waterproofing membrane construction, after cleaning the base layer, brush the adhesive glue on the reverse side of the membrane and the base layer, paste and roll it from far to near according to the elastic baseline, and finally do the joint inspection treatment. After completion, a water storage experiment should be done.

2. Waterproof paint, take "one cloth and two paint" as an example: After cleaning the base layer, brush the paint completely, and after drying to form a film, lay a layer of glass fiber cloth carcass reinforcement and cover it on the flattened surface. Apply a layer of paint to fix it, and perform the next roof waterproofing construction after drying.

3. To lay the rigid waterproof layer, the construction should be carried out about two days after the completion of the first flexible waterproof layer. The basic materials are mainly high fatty acid mortar waterproofing agent, cement, sand, fine stone aggregate, and fiber. The thickness of the waterproof layer is Should be 20-30 mm.

4. Cover the top with glass, aluminum plate, color steel plate, etc., waterproof and have ventilation and heat insulation effect. The top is equipped with a steel structure keel, covering the waterproof layer of aluminum plate, glass, color steel plate, etc., and glue treatment.